Optimize Bonus Calculation for 100k+ employees
Client
Dell
Service
Product Design
Industry
HR
Year
2025
Client: Dell Technologies · Role: Senior Product Designer · Industry: HR · Year: 2025 · Scope: 100,000+ employees
Thousands of bonuses, one end-of-life tool
In short: bonus calculation for 100k+ employees ran on an end-of-life tool with a home screen nobody used. I deprecated the unused parts and rebuilt process control around the real workflow. The bonus cycle dropped from one quarter to one month (−67%), with NPS 80.
How do you calculate bonuses for thousands of employees, verify they are correct, and report them?
Current solution does it
Framework end-of-life
DDS (new design system) adoption
Goals
Verify unused software
Check current solution business adherence
Gather improvement opportunities
Research Strategy
Survey to gather report usage
Exploratory interview to check current process
Analyze direct and indirect similar platforms
Analyze Splunk usage reports
Gather support tickets data to support decision
Nobody used the home screen; process control needed the attention
“BCT is perfect!” - It works really well: Everybody agreed, at some level.
User Maintenance is non-compliant: User roles should be maintained in Workday
The home screen went unused: Nobody mentioned using it
Reports: Don’t fix what’s not broken!
Employee search is good: But, it could have some improvements.
Upload/process control: This flow deserves attention
Workflow: user does it outside the platform
User roles are stable: No evidence of change needed.
Benchmark Research

User Journeys for “Admin” and “Processor” roles


Execution Priority

Deprecate what's unused, rebuild what matters
Step 1: Deprecate unused/non-compliant software
Step 2: start developing as soon as possible
Step 3: re-design the target - test it - iterate
Prototyping Day


Lightning Demos
Past good experiences - Past experiences on apps or solutions
Favorite products - What are you using everyday?
Trending - Technologies that are up.

Paper Prototyping - round 1

Prototyping - round 2

Mid resolution prototypes (content blurred for privacy)

Dell Design System rebuild, live validation, readable logs

Dell Design System adopted, automatic refresh + relevant data added to report (# impacted records and run time).

Major information architecture improvement, with data grouped by categories + tabs.

Real-time validation of file name and format.

Human-readable log + record count + run time in the same screen.
Prototype with accessibility annotation

Cycle −67%, NPS 80
Bonus cycle cut from one quarter to one month (−67%)
NPS of 80 after the redesign
Dell Design System (DDS) adopted across the redesigned flows
Accessibility annotations delivered with the design, so engineering built it right the first time
If I did it again, I'd put processors in front of prototypes earlier — support tickets had already flagged process control as the sore spot before we started.



